Dashboard

Week of 10 Mar 2026 Β· Logged in as J. Smith (Engineer)

12
Active Projects
7
Reports Approved
3
Awaiting Approval
2
Failed QA / Rejected

My Pending Actions

RCH Tower B β€” v2 awaiting your review
Engineer review required before Approver sign-off
Step 1 of 2
Brisbane Airport T3 β€” Rejected, action required
Rejected by D. Williams: "RT targets not matching HTM spec"
Canberra University β€” Extraction needs review
8 low-confidence fields flagged Β· OCR source

Recent Projects

ProjectStageStatusUpdated
RCH Tower B
IRG-2026-041
DDEng. Review2 hrs ago
Westfield Parramatta
IRG-2026-039
AUTHApprovedYesterday
Brisbane Airport T3
IRG-2026-037
CONRejected1 day ago
Canberra Uni β€” Lecture Block
IRG-2026-035
DDExtracting3 days ago

Projects

12 active projects

ProjectStageBuilding TypeStandardsEngineerApproverStatusReportUpdated
Royal Children's Hospital β€” Tower B
IRG-2026-041
DDHealthcareAS/NZS 2107, NCCJ. SmithD. WilliamsEng. Reviewv22 hrs ago
Westfield Parramatta
IRG-2026-039
AUTHCommercialNCC 2022M. ChenD. WilliamsApprovedv3Yesterday
Brisbane Airport β€” T3
IRG-2026-037
CONTransportWHO, NCC, HTML. ParkK. ThompsonRejectedv11 day ago
Canberra Uni β€” Lecture Block
IRG-2026-035
DDEducationBB93, AAACJ. SmithD. WilliamsExtractingβ€”3 days ago

Create New Project

Project Details

Design Stage

Applicable Standards

Select all that apply β€” rules engine will load matching criteria

Team Assignment

β„Ή Only the designated approver can give final sign-off on this project's reports.

Word Template

IRG-2026-042_DD_2026-03-14_v1.docx
Auto-generated from: ProjectRef_Stage_Date_vN.docx

Royal Children's Hospital β€” Tower B

DDHealthcareEngineer Review IRG-2026-041 Β· AS/NZS 2107, NCC Β· J. Smith β†’ Approver: D. Williams
βœ“
Created
βœ“
Docs Uploaded
βœ“
Data Extracted
βœ“
Compliance Run
βœ“
Report Generated
6
Eng. Review
7
Approver Sign-off
8
Senior Sign-off
9
Final Export
Overview
Documents (4)
Extracted Data
Compliance Matrix
Reports (v2)

Project Info

ReferenceIRG-2026-041
Building TypeHealthcare
Floor Area18,400 mΒ²
Total Rooms85
StandardsAS/NZS 2107, NCC
Lead EngineerJ. Smith
ApproverD. Williams
Senior ApproverK. Thompson

Compliance Summary

72
Pass
3
Fail
10
N/A
8
TBC
2
Excluded

Approval Status

βœ“
Report Generated
System Β· 12 Mar 14:32 Β· QA passed
⏳
Engineer Review β€” In Progress
J. Smith Β· 2 annotations open
2
Approver Sign-off β€” Pending
D. Williams Β· waiting for step above
3
Senior Sign-off β€” Pending
K. Thompson
✦

AI Project Assistant

Ask anything about this project β€” update fields, get summaries, or check compliance
● Online
πŸ‘‹ Hi J. Smith! I'm your AI assistant for RCH Tower B. I can help you:

β€’ Update project fields (floor area, standards, team members)
β€’ Summarise compliance results or flag issues
β€’ Draft annotation comments or review notes
β€’ Answer questions about AS/NZS 2107 requirements

What would you like to do?
Can you update the floor area to 19,200 mΒ² and add K. Brown as a co-engineer?
Done! I've updated the following fields for IRG-2026-041:

β€’ Floor Area: 18,400 mΒ² β†’ 19,200 mΒ²
β€’ Co-Engineer: Added K. Brown

These changes have been saved and logged in the audit trail. Would you like me to regenerate the report header to reflect these updates?
Yes, regenerate the report header only.
Regenerating report header…
Quick actions:

Upload Documents

Upload Files

πŸ“‚
Drop files here or click to browse
PDF Β· DOCX Β· XLSX Β· IFC (2x3, 4, 4.3) Β· Max 500 MB per file
⚠ Scanned/image-only PDFs supported via OCR β€” accuracy may be lower
πŸ“„
RCH_TowerB_DrawingSet_Rev5.pdf
45.2 MB Β· OCR Scanned PDF detected
Done
πŸ“Š
RCH_RoomSchedule_v3.xlsx
1.8 MB Β· Structured Excel
72%
πŸ—
TowerB_Model_R3.ifc
12.4 MB Β· IFC β€” version detection pending
30%

Uploaded Documents (v2)

FileTypeSourceStatusVer.
DrawingSet_Rev5.pdfPDFOCRExtractedv2
RoomSchedule_v3.xlsxXLSXTextExtractedv1
Specification_S13.docxDOCXTextExtractedv1
TowerB_Model.ifcIFCBIMProcessingv1
β„Ή All file versions retained permanently. Previous uploads remain accessible in version history.

Extracted Data Review

Target: >90% accuracy before proceeding. Manual edits enabled.

⚠ 8 fields flagged as low-confidence (< 0.6) β€” mostly from OCR-scanned drawings. Please verify before proceeding. Estimated extraction accuracy: 91.4%
Rooms (85)
Doors (42)
Walls (31)
Free Text Notes (6)
Room IDRoom NameRoom TypeArea mΒ²RT Target (s)NC TargetRw TargetSourceConfidenceStatus
1.01Patient Ward AWard24.00.6NC-3055 XLSX0.96βœ“ OK
1.02ICU Bay 1ICU18.5 TBCNC-2555 OCR0.52⚠ Low Conf.
1.03Nurses StationStaff Area32.00.5NC-4050 XLSX0.91βœ“ OK
1.04Operating Theatre 1Theatre62.00.4 TBC60 Free Text0.48⚠ Free Text
2.05Plant Room 2Plant Room14.0β€”β€”β€” IFCβ€” Excluded

Compliance Matrix

Deterministic rule-based evaluation β€” 85 rooms Γ— 7 metrics Β· with gap values

72
Pass
3
Fail
8
TBC
2
Excluded
PASS Pass FAIL Fail TBC Data missing EXCL Excluded
RoomType RT_MID (s)
AS/NZS 2107
RT_500Hz (s)
AS/NZS 2107
NC Level
AS/NZS 2107
Rw (wall)
NCC 2022
DnTw
NCC 2022
Impact
NCC 2022
Overall
1.01 Patient Ward AWard
PASS
0.55 / 0.60 (+0.05)
PASS
PASS
NC-28 / NC-30
PASS
57 / 55 (+2)
N/A
PASS
PASS
1.02 ICU Bay 1ICU
TBC
TBC
PASS
PASS
N/A
N/A
TBC
1.04 Operating Theatre 1Theatre
FAIL
0.45 / 0.40 (βˆ’0.05)
FAIL
0.48 / 0.40 (βˆ’0.08)
TBC
PASS
PASS
N/A
FAIL
2.05 Plant Room 2Plant Room
EXCLUDED β€” not subject to acoustic compliance
EXCL

Report Review

IRG-2026-041_DD_2026-03-12_v2.docx
Draft Β· QA βœ“ Passed
βœ“
QA Checks
All passed
2
Engineer Review
J. Smith β€” in progress
3
Approver Sign-off
D. Williams β€” waiting
4
Senior Sign-off
K. Thompson β€” waiting
5
Final Export
Locked DOCX
⚠ 3 rooms have FAIL status and 8 TBC items are highlighted in the document. Engineering judgement required before submission to approver.
Acoustic Compliance Report
Royal Children's Hospital β€” Tower B
Design Development Stage Β· IRG-2026-041 Β· 12 March 2026
Prepared by: J. SmithStandards: AS/NZS 2107:2016, NCC 2022

Scope of Works

This report presents the acoustic compliance assessment for the Design Development stage of Tower B, Royal Children's Hospital, Brisbane. The assessment covers all habitable and clinical spaces within the tower across 10 levels, totalling 85 assessed rooms. The assessment has been carried out in accordance with Australian Standard AS/NZS 2107:2016 and the National Construction Code 2022 Volume 1.

The scope includes evaluation of room acoustics (reverberation time), background noise criteria (NC/NR levels), and airborne sound insulation (Rw/DnTw) between adjacent spaces. Note: ICU Bay 4 scope confirmation pending β€” TBC. 2 plant rooms have been excluded from compliance assessment.

πŸ” Retrieved from: Healthcare_RPA_DD_2024.docx β€” Β§1 Scope, p.2 Β· Similarity: 0.91 Β· LLM-assisted paraphrase (reviewed)

Applicable Standards & Criteria

The following standards have been applied: AS/NZS 2107:2016; NCC 2022 Vol. 1; AAAC Healthcare Acoustics Guidelines (2019); WHO Environmental Noise Guidelines (2018).

πŸ” Retrieved from: RCH_Existing_2023.docx β€” Β§2 Standards, p.4 Β· Similarity: 0.88

Methodology

Room schedules, door schedules, and wall construction details were extracted from the supplied documentation set (Drawing Set Rev.5 [OCR extracted β€” verify RT zones TBC], Room Schedule v3, Specification Section 13). Acoustic compliance was assessed using deterministic evaluation against criteria stored in the IRG criteria engine. Reverberation time calculations were performed using Sabine's equation.

πŸ” Retrieved from: Healthcare_Gen_2022.docx β€” Β§3 Method, p.7 Β· Similarity: 0.85

Compliance Summary

Of the 85 assessed rooms: 72 comply with all applicable acoustic criteria; 3 rooms fail (Operating Theatre 1, ICU Bay 4, Endoscopy Suite 2 β€” see Β§5 for recommendations); 8 rooms are TBC pending receipt of [client RT measurement data β€” TBC]; 2 plant rooms excluded from assessment.

Assumptions & TBC Register

⚠ Outstanding Items β€” to be resolved before final report
RefItemAction
A-01ICU Bay 1 RT target β€” not extractable from scanned drawingClient to confirm
A-02NC target for Operating Theatre 1 β€” free text ambiguousEngineer to clarify
A-03ICU Bay 4 scope β€” is it in scope for DD stage?Client to confirm

Annotations (2 open)

Β§4 β€” Failing theatres
Add recommendation for RT absorptive treatment options before sending to approver.
J. Smith Β· 12 Mar 14:45
Β§1 β€” ICU Bay 4
Confirm with client whether ICU Bay 4 is in scope for this stage.
J. Smith Β· 12 Mar 14:50
Β§2 β€” Standard version
Updated to NCC 2022 βœ“
Resolved Β· 12 Mar 15:02

QA Checks

βœ“ All sections present
βœ“ No empty placeholders
βœ“ Compliance matrix complete
βœ“ All rooms addressed
⚠ 3 rooms FAIL β€” engineer must note
⚠ 8 TBC items highlighted yellow
βœ“ TBC register in Appendix A
βœ“ Inline TBC items highlighted
βœ“ All RAG clauses sourced

RAG Clause Sources

Β§1: RPA_DD_2024 Β· p.2 Β· 0.91
Β§2: RCH_2023 Β· p.4 Β· 0.88
Β§3: Healthcare_Gen_2022 Β· p.7 Β· 0.85
Β§5 Recommendations: No match found β€” flagged for manual authoring

Clause Library

52 active reports Β· 4,831 indexed chunks Β· Approval workflow for new submissions

52
Active Reports
4,831
Clause Chunks
2
Awaiting Admin Approval
3
Pending Reindex
⚠ 2 newly submitted reports are awaiting Admin approval before they are added to the active corpus.
Active Corpus
Pending Approval (2)
Archived
Report NameBuilding TypeStageCountryChunksFormatStatusIngested
RPA_Healthcare_DD_2024Healthcare β€” TertiaryDDAU142DOCXActiveJan 2026
Westmead_Hospital_AUTH_2023Healthcare β€” PublicAUTHAU118DOCX+PDFActiveNov 2025
UQ_Education_Block_DD_2024Education β€” UniversityDDAU97PDFReindex NeededDec 2025
Dubai_Medical_Centre_DD_2025Healthcare β€” ClinicDDUAE104DOCXActiveFeb 2026
Missing clause policy: If no suitable clause is retrieved during report generation, the section is flagged and assigned to the lead engineer for manual authoring.

Pending Admin Approval

2 awaiting review
Report NameSubmitted ByDateFormatAdmin Action
Westmead_Hospital_New_2026.docx IT Dept (auto-submitted) 13 Mar 2026 DOCX
Toronto_Office_Tower_2025.pdf IT Dept (auto-submitted) 11 Mar 2026 PDF

Admin Panel

System configuration β€” Admin access only

Admin Access Only

Acoustic Rules

Active rule set β€” v4 Β· 218 rules across 7 standards

β„Ή Edits take effect immediately for new reports. Old rule set versions are archived automatically β€” existing approved reports always re-run against the rule set used at time of generation.
#StandardRoom TypeMetricTarget ValueToleranceCountryActiveRule Ver.Last Updated
R-001AS/NZS 2107WardRT_MID0.60 sΒ± 0.05 sAU / NZβœ“v310 Mar
R-002AS/NZS 2107ICURT_MID0.40 sΒ± 0.05 sAU / NZβœ“v28 Feb
R-003AS/NZS 2107Operating TheatreRT_MID0.40 sΒ± 0.03 sAU / NZβœ“v410 Mar
R-004AS/NZS 2107WardNC_LEVELNC-30Β± 5AU / NZβœ“v28 Feb
R-005NCC 2022WardRW_WALL55 dBβ€”AUβœ“v2Jan
R-006NCC 2022Residential β€” ApartmentDNTW45 dBβ€”AUβœ“v1Jan
R-007HTM 08-01Operating TheatreNC_LEVELNC-25Β± 5UK / UAEβœ“v1Feb
R-008BB93ClassroomRT_MID0.60 sΒ± 0.1 sUKβœ“v1Jan
R-009WHO 2018WardNC_LEVELNC-30Β± 5Globalβœ“v1Jan
Showing 9 of 218 rules

Rule Archives

Historical rule sets β€” retained permanently for re-generation of past reports

⚠ Archived rule sets are read-only. You can restore a set to become the active set, which will archive the current active set first.
Rule SetStandards CoveredRules CountArchived OnArchived ByReasonUsed By Reports
Rule Set v3
Active: Jan 2026 – 10 Mar 2026
AS/NZS 2107, NCC 2022, WHO214 10 Mar 2026K. Thompson Theatre RT_MID updated 0.45β†’0.40s (AS/NZS 2107:2016 rev) 7 reports
Rule Set v2
Active: Sep 2025 – Jan 2026
AS/NZS 2107, NCC 2022198 15 Jan 2026D. Williams Added HTM 08-01 rules for UAE projects 12 reports
Rule Set v1
Active: Mar 2025 – Sep 2025
AS/NZS 2107, NCC 2022176 15 Sep 2025K. Thompson Initial rule set at platform launch 21 reports

Rule Set v3 β€” Detail View (read-only)

Viewing archived Rule Set v3. These rules were active for 7 reports. This view is read-only.
StandardRoom TypeMetricTargetNote
AS/NZS 2107Operating TheatreRT_MID0.45 sSuperseded by v4 (now 0.40s)
AS/NZS 2107WardRT_MID0.60 sUnchanged
NCC 2022WardRW_WALL55 dBUnchanged

Room Types

Free-text list, admin-extendable without code deployment Β· 23 types defined

β„Ή Room types here map to acoustic rules in the criteria engine. Adding a type here makes it available for extraction review and compliance evaluation. Each type can be mapped to one or more metrics.
Room Type NameCategoryMetrics AppliedStandardsCompliance RequiredRules Linked
WardHealthcareRT_MID, NC_LEVEL, RW_WALLAS/NZS 2107, NCC, WHOYes9
ICUHealthcareRT_MID, RT_500Hz, NC_LEVEL, RW_WALLAS/NZS 2107, HTM 08-01Yes7
Operating TheatreHealthcareRT_MID, RT_500Hz, NC_LEVEL, RW_WALL, DNTWAS/NZS 2107, HTM 08-01, NCCYes12
ClassroomEducationRT_MID, NC_LEVEL, DNTWBB93, AAACYes6
Office β€” Open PlanCommercialRT_MID, NC_LEVELAS/NZS 2107, NCCYes4
Plant RoomServicesβ€”β€”Excluded0
CorridorCirculationβ€”β€”Optional1

Word Templates

DOCX templates with named placeholder variables Β· 4 templates loaded

β„Ή Templates must have named placeholders in {{variable_name}} format. Upload a .docx and the system will scan and list all detected placeholders.
Healthcare_Report_v3.docx Default
General firm template Β· Uploaded 15 Jan 2026 by K. Thompson
Detected Placeholders (14):
{{project_name}} {{project_ref}} {{stage}} {{date}} {{engineer_name}} {{standards_list}} {{scope_text}} {{methodology_text}} {{compliance_table}} {{recommendations_text}} {{assumptions_register}} {{rt_target}} {{nc_target}} {{client_logo}} ⚠ unmapped
Education_Report_v2.docx
Education projects Β· Uploaded 20 Feb 2026 by D. Williams
11 placeholders detected Β· All mapped βœ“
Client_Custom_QH.docx Client Template
Queensland Health branding Β· Uploaded 1 Mar 2026 by J. Smith
9 placeholders detected Β· 2 unmapped β€” edit required

Filename Convention

Configure the auto-generated filename for exported DOCX and PDF reports.

Filename Segments

Project Reference
e.g. IRG-2026-041
Position 1
Stage
e.g. DD, CON, AUTH
Position 2
Date
Format:
Position 3
Version Number
Prefix: e.g. v1, v2
Position 4
Engineer Initials
Optional β€” e.g. JS
Position 5
Separator Character

Live Preview

IRG-2026-041_DD_2026-03-14_v2.docx
PDF variant: same name with .pdf extension
Examples
IRG-2026-041_DD_2026-03-14_v2.docx
IRG-2026-039_AUTH_2026-02-28_v3.docx
IRG-2026-035_CON_2026-01-10_v1.docx
5
Total Users
5
Active
1
MFA Pending
2
Engineers

Users & Roles

β„Ή Passwords are admin-managed only. Users cannot reset their own passwords. MFA is mandatory for all roles.
NameEmailRoleDepartmentMFAAccessLast LoginStatus
J. Smith j.smith@firm.com.au Engineer Acoustics βœ“ Active Office + Remote Today 09:02 Active
M. Chen m.chen@firm.com.au Engineer Acoustics βœ“ Active Office Only Yesterday Active
D. Williams d.williams@firm.com.au Approver Senior Engineering βœ“ Active Office + Remote 10 Mar Active
K. Thompson k.thompson@firm.com.au Admin Management βœ“ Active Office + Remote 8 Mar Active
Client User A viewer@builder.com Viewer External ⚠ Setup Pending Office Only 5 Mar Active

Role Permissions Matrix

PermissionAdminApproverEngineerViewer
Create / edit projectsβœ…βŒβœ…βŒ
Upload documentsβœ…βŒβœ…βŒ
Edit extracted dataβœ…βŒβœ…βŒ
Generate reportsβœ…βŒβœ…βŒ
Submit report for approvalβœ…βŒβœ…βŒ
Approve / reject reports (1st level)βœ…βœ…βŒβŒ
Senior sign-off (2nd level)βœ…βœ…βŒβŒ
Download approved DOCXβœ…βœ…βœ…βœ…
View compliance matrixβœ…βœ…βœ…βœ…
Manage acoustic rulesβœ…βŒβŒβŒ
Approve clause library submissionsβœ…βŒβŒβŒ
Manage usersβœ…βŒβŒβŒ
View audit logβœ…βœ…βŒβŒ

Email Notification Settings

Configure which events trigger email notifications and who receives them.

SMTP Configuration

Notification Events

Report submitted for approval
Sent to: Designated Approver
Report approved (1st level)
Sent to: Lead Engineer, Senior Approver
Report approved (final β€” 2nd level)
Sent to: Lead Engineer, Approver, all project members
Report rejected
Sent to: Lead Engineer β€” includes rejection comments
Extraction complete β€” low confidence flagged
Sent to: Lead Engineer
Clause library report submitted (pending approval)
Sent to: All Admins
Acoustic rule updated or archived
Sent to: All Admins, All Engineers
New user account created
Sent to: New user (welcome + MFA setup), All Admins
MFA failed (3+ attempts)
Sent to: All Admins β€” security alert
Backup failure alert
Sent to: All Admins
2
Active Regions
AES-256
Encryption at Rest
TLS 1.3
Encryption in Transit

Data Residency Configuration

⚠ All project data, documents, reports, and extracted data must remain within the configured residency regions. Outbound LLM API calls (Claude, OpenAI) send only request payloads β€” no raw documents are transmitted.

Storage Regions

πŸ‡¦πŸ‡ͺ
UAE (Primary)
Azure UAE North Β· All write operations Β· Primary DB
Primary Active
πŸ‡¨πŸ‡¦
Canada (Secondary)
Azure Canada Central Β· Backup & read replica Β· Disaster recovery
Secondary Active
🏒
On-Premises Server
Physical server within firm office β€” future option
Planned

Compliance Frameworks

ISO 27001In Progress
Australian Privacy Act 1988Compliant
UAE PDPL (Data Protection)In Progress
Canada PIPEDAIn Progress
SOC 2 Type IIPlanned

LLM API Data Policy

⚠ Important: What leaves the residency boundary
βœ“ Structured project context (room names, targets, stage) β€” sent to Claude for report assembly
βœ“ Embedding queries (anonymised text chunks) β€” sent to OpenAI for vector indexing
βœ— Raw uploaded documents are never transmitted externally
βœ— Engineer identifiers and client names are redacted from LLM payloads
Offline LLM (air-gapped) β€” Post-MVP: A fully air-gapped local LLM deployment is planned to eliminate all outbound data transfer for maximum compliance.
Real-time
Backup Frequency
Zero
RPO (Data Loss)
TBD
RTO Target
∞
Retention Period

Backup Configuration

Backup Schedule

Database (PostgreSQL)Real-time replication
File Storage (DOCX / PDF)Every 15 min snapshot
Vector Store (pgvector)Nightly full backup
Audit LogImmutable β€” append only
Application ConfigOn change only

Backup Targets

πŸ‡¦πŸ‡ͺ UAE Primary β†’ πŸ‡¨πŸ‡¦ Canada Secondary
Cross-region replication β€” active-passive
Encryption in backup
AES-256 at rest Β· Backup keys stored in Azure Key Vault
Retention policy
All data retained permanently β€” no automated deletion

Restore Points

14 Mar 2026 β€” 15:00 UTC
Full DB snapshot Β· 2.4 GB Β· UAE region
Latest
14 Mar 2026 β€” 00:00 UTC
Daily snapshot Β· 2.3 GB Β· Canada replica
13 Mar 2026 β€” 00:00 UTC
Daily snapshot Β· 2.2 GB
All OK
System Status
99.8%
Uptime (30 days)
142 ms
API Avg Latency
78%
Storage Used

Service Status

Last checked: 14 Mar 15:45 UTC
FastAPI Backend
v1.4.2 Β· 3 replicas Β· 142 ms avg
Operational
PostgreSQL + pgvector
v15.3 Β· UAE primary Β· Replica lag: 12 ms
Operational
Redis (Task Queue)
v7.2 Β· 4 queued tasks Β· 0 failed
Operational
Celery Workers
3 active workers Β· 0 pending
Operational
React Frontend (CDN)
v1.4.0 Β· Cache hit rate: 91%
Operational
Anthropic API (Claude)
Outbound Β· Last call: 14:32 Β· Elevated latency
Degraded
OpenAI API (Embeddings)
Outbound Β· Last call: 14:30 Β· 210 ms avg
Operational
Azure Blob Storage (UAE)
Primary Β· 1.84 TB used Β· Replication active
Operational
Azure Blob Storage (Canada)
Replica Β· Sync lag: 8 s
Operational

Storage Usage

Uploaded Documents1.12 TB / 2 TB
Generated Reports (DOCX/PDF)420 GB / 500 GB
Vector Embeddings (pgvector)8.4 GB / 50 GB
Audit Logs2.1 GB / unlimited
Total Used1.55 TB / 2.55 TB (61%)

Recent System Events

βœ“ 14 Mar 14:32 β€” Report generated (IRG-2026-041)
⚠ 14 Mar 13:15 β€” Claude API latency > 3s (elevated)
βœ“ 14 Mar 00:00 β€” Nightly backup completed (Canada)
βœ“ 13 Mar 14:20 β€” Clause library reindex complete (3 reports)
βœ“ 13 Mar 00:00 β€” Nightly backup completed (Canada)

Audit Log

Immutable activity trail β€” all system events

TimestampUserActionEntityDetailsStatusIP / Region
14 Mar Β· 15:32J. SmithREPORT_SUBMITTEDIRG-2026-041 v2Submitted to approver D. Williams. 2 annotations.OK10.0.1.42 / UAE
14 Mar Β· 14:32SystemREPORT_GENERATEDIRG-2026-041 v285 rooms, 52 clauses retrieved, QA passed, TBC Γ—8 highlightedOKinternal
14 Mar Β· 09:02J. SmithUSER_LOGIN_MFAAuthMFA verified successfullyOK10.0.1.42 / UAE
13 Mar Β· 16:20IT DeptCLAUSE_SUBMITTEDWestmead_2026.docxNew report submitted to clause library β€” awaiting Admin approvalPendinginternal / CA
12 Mar Β· 09:15D. WilliamsREPORT_REJECTEDIRG-2026-041 v1Reason: NCC version outdated, ICU scope unclearOK10.0.1.10 / UAE
10 Mar Β· 11:04K. ThompsonRULE_ARCHIVEDRule #48 Theatre RT_MID v3Archived old rule; new v4 target: 0.40s (AS/NZS 2107:2016)OK10.0.1.10 / UAE